GLENWOOD DYER RD over IL 394

3.1 M S I-80 · County 031, Illinois · Built 1954 · 2 Lanes · 9,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
016062400000000
Year Built
1954
Reconstructed
1992
Length
71.4 m (234.3 ft)
Max Span
19.5 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
9,750
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$193,000
Total Project Cost
$232,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.