FAU-1292 (E Lake A over N Br Chicago River

1.1 M E ILL 43 P14 · County 031, Illinois · Built 1935 · 4 Lanes · 22,900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
2
Critical
Superstructure
2
Critical
Substructure
5
Fair

Bridge Details

Structure #
016054400000000
Year Built
1935
Reconstructed
1981
Length
25.3 m (83 ft)
Max Span
8.2 m
Width
17.5 m (57.4 ft)
Lanes
4
Daily Traffic
22,900
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$440,000
Total Project Cost
$660,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.