I-190 EB JFK over DES PLAINES RIVER

2.5 M W IL 43 · County 031, Illinois · Built 1959 · 3 Lanes · 31,550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
016051400000000
Year Built
1959
Reconstructed
1988
Length
80 m (262.5 ft)
Max Span
19.8 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
31,550
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,416,000
Total Project Cost
$3,624,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.