IL 7 SOUTHWEST H over CAL SAG CHANNEL

0.5 M NE IL 83 · County 031, Illinois · Built 1931 · 4 Lanes · 25,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
016046400000000
Year Built
1931
Reconstructed
2003
Length
105.6 m (346.5 ft)
Max Span
65.8 m
Width
18.4 m (60.4 ft)
Lanes
4
Daily Traffic
25,400
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,223,000
Total Project Cost
$1,835,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.