I- 90 94 SEB JFK over CALIFORNIA AVE

2.4 M NW IL 64 · County 031, Illinois · Built 1958 · 4 Lanes · 102,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016012400000000
Year Built
1958
Reconstructed
1993
Length
64.1 m (210.3 ft)
Max Span
29.3 m
Width
22.3 m (73.2 ft)
Lanes
4
Daily Traffic
102,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$817,000
Total Project Cost
$1,349,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.