I- 55 EB STEVENSON over KEDZIE AVE

2 M NE ILL 50 · County 031, Illinois · Built 1963 · 3 Lanes · 88,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016002200000000
Year Built
1963
Reconstructed
1999
Length
52.5 m (172.2 ft)
Max Span
24.7 m
Width
21.4 m (70.2 ft)
Lanes
3
Daily Traffic
88,250
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.