CH 22 over I-57

2 MI N EXIT 192 · County 029, Illinois · Built 1965 · 2 Lanes · 125 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

39.550131, -88.313114

This bridge is in worse condition than 93% of bridges in County 029. The average bridge in Illinois is 0 years old; this one is 61 years old.

Nearby Bridges

Bridge Details

Structure #
015004400000000
Year Built
1965
Length
68.2 m (223.8 ft)
Max Span
20.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
125
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$797,000
Total Project Cost
$929,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.