TR 28/TANK ROAD over BRANCH SUGAR CREEK
1.5 MI W ALBERTS · County 027, Illinois · Built 1901 · 2 Lanes · 250 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
38.541422, -89.653975
This bridge is in worse condition than 38.4% of bridges in County 027. The average bridge in Illinois is 0 years old; this one is 125 years old.
Nearby Bridges
TR 177/COURT ROAD over SUGAR CREEK
Built 1984
TR177/COURT ROAD over TRIBUTARY SUGAR CREK
Built 1979
ILL 161 over SUGAR CREEK
Built 2010
COURT ROAD/TR177 over LAKE BRANCH
Built 1992
ILL 161 over LAKE CREEK BRANCH
Built 1934
ILL 160 over N TRIB TO BR LAKE CR
Built 1955
FAI 64 over TRIB TO QUEENS LAKE
Built 1973
TWP LINE/WESCLIN R over BRANCH OF SUGAR CK
Built 1941
Billhartz Rd-FAS 7 over FAI 64
Built 1970
DAMIANSVILLE RD over SUGAR CREEK
Built 2004
Bridge Details
- Structure #
- 014304100000000
- Year Built
- 1901
- Reconstructed
- 1975
- Length
- 11 m (36.1 ft)
- Max Span
- 10.4 m
- Width
- 5.8 m (19 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Concrete
- Design
- Channel Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $33,000
- Total Project Cost
- $36,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.