FAS 788 over LOST CREEK

1.5 MI N HOFFMANN · County 027, Illinois · Built 1959 · 2 Lanes · 575 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
014300800000000
Year Built
1959
Length
37.8 m (124 ft)
Max Span
13.4 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
575
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.