TR-229 over SUGAR CREEK
6 MI E SAILOR SPRING · County 025, Illinois · Built 1950 · 1 Lanes · 150 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
38.745553, -88.261639
This bridge is in worse condition than 73.1% of bridges in County 025. The average bridge in Illinois is 0 years old; this one is 76 years old.
Nearby Bridges
TR-14 over TRIB SUGAR CREEK
Built 1994
TR-396 over SUGAR CREEK
Built 1949
TR-396 over HURRICANE CREEK
Built 1987
TR-229 over BIG MUDDY CREEK
Built 1980
FAS-799 (CH-3) over HURRICANE CREEK
Built 1909
TR-229 over DRAINAGE DITCH
Built 1997
FAS-706 (CH-9) over TRIB SUGAR CREEK
Built 1987
FAS 706 over SUGAR CREEK
Built 2001
TR 388 over E FK WET WEATHER CR
Built 1923
TR 179 over Hurricane Creek
Built 2019
Bridge Details
- Structure #
- 013309900000000
- Year Built
- 1950
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.7 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 150
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $64,000
- Total Project Cost
- $96,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.