FAP-828 (CC-MONT B over L WABASH RIVER OVFLO

.75 MI N CLAY CITY · County 025, Illinois · Built 1952 · 2 Lanes · 1,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
013002000000000
Year Built
1952
Reconstructed
2001
Length
210 m (689 ft)
Max Span
20.1 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
1,850
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,604,000
Total Project Cost
$3,038,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.