TR 116 over WILLOW CREEK TRIB

1.75 MI NE MOONSHINE · County 023, Illinois · Built 1996 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
012329600000000
Year Built
1996
Length
20 m (65.6 ft)
Max Span
19.5 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.