TR 243 over UNION D.D #3 MAIN
2.5 MI SW ASSUMPTION · County 021, Illinois · Built 1993 · 2 Lanes · 275 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
39.479489, -89.084892
This bridge is in worse condition than 49.4% of bridges in County 021. The average bridge in Illinois is 0 years old; this one is 33 years old.
Nearby Bridges
TR 229 A over BIG GEORGE BRANCH
Built 1900
TR 255 over UNION DR DIS #3 MAIN
Built 1955
TR 270 over BIG GEORGE CREEK
Built 1980
TR 290 over LAKE FORK
Built 1957
TR 273 over LAKE FORK
Built 1950
TR 217A over BIG GEORGE BRANCH
Built 1978
TR 273 over S. FORK LAKE FORK
Built 1950
TR 255 over Lake Fork
Built 2015
US 51(SB) over MAIN DRAIN DITCH
Built 2002
US 51(NB) over MAIN DRAIN DITCH
Built 2015
Bridge Details
- Structure #
- 011336800000000
- Year Built
- 1993
- Length
- 15.7 m (51.5 ft)
- Max Span
- 14.9 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 275
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.