TR 82 over ACHENBACH BRANCH

3.5 N PALMER · County 021, Illinois · Built 1920 · 1 Lanes · 50 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
4
Poor
Superstructure
4
Poor
Substructure
2
Critical

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 4 Poor
Substructure 2 Critical

Location

39.515775, -89.403817

This bridge is in worse condition than 98.1% of bridges in County 021. The average bridge in Illinois is 0 years old; this one is 106 years old.

Nearby Bridges

Bridge Details

Structure #
011327600000000
Year Built
1920
Length
6.7 m (22 ft)
Max Span
3.2 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
50
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$16,000
Total Project Cost
$24,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.