CH-1 (FAS-645) over S FORK SANGAMON RIV

5.5 Mi S Taylorville · County 021, Illinois · Built 1957 · 2 Lanes · 2,150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
011302400000000
Year Built
1957
Reconstructed
2015
Length
49.2 m (161.4 ft)
Max Span
16.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.