CH12-FAS 732 over COTTON CREEK

7.5 MI W PANA · County 021, Illinois · Built 1925 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
011301300000000
Year Built
1925
Reconstructed
1971
Length
13.5 m (44.3 ft)
Max Span
8.8 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
500
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.