FAP 75 (IL 29) over Main drainage ditch
1.8 mi NW of Pana · County 021, Illinois · Built 2024 · 2 Lanes · 3,750 vehicles/day
Overall
Culvert
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 9 | Excellent |
Location
39.420158, -89.122514
This bridge is in worse condition than 17.8% of bridges in County 021. The average bridge in Illinois is 0 years old; this one is 2 years old.
Nearby Bridges
TR 258 over LAKE FORK
Built 1898
TR 303 over LAKE FORK
Built 1900
TR 254 over LAKE FORK
Built 1953
TR 283 over LAKE FORK
Built 1971
CH-12 (FAS-732) over LAKE FORK
Built 1940
IL 29 over LOCUST CREEK TRIB.
Built 1924
TR 242 over COMERFORD BRANCH
Built 1986
TR 325 over COAL CREEK
Built 1959
TR 282A over LAKE FORK
Built 1927
TR 283 over LOCUST CREEK
Built 1992
Bridge Details
- Structure #
- 011251800000000
- Year Built
- 2024
- Length
- 11.6 m (38.1 ft)
- Max Span
- 3.7 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 3,750
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.