ILL 104 over LAKE SANGCHRIS

.25 E SANG CO · County 021, Illinois · Built 1965 · 2 Lanes · 2,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
011001900000000
Year Built
1965
Reconstructed
1998
Length
28.3 m (92.8 ft)
Max Span
11.2 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,700
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$285,000
Total Project Cost
$428,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.