CH 13 over LITTLE VERM DITCH

3.3 MI N OF BROADLAN · County 019, Illinois · Built 2021 · 2 Lanes · 425 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
010458900000000
Year Built
2021
Length
22.1 m (72.5 ft)
Max Span
20.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
425
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.