TR 312 over STREAM

3 MI SE OF ST JOSEPH · County 019, Illinois · Built 1974 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
010402800000000
Year Built
1974
Reconstructed
2024
Length
16.1 m (52.8 ft)
Max Span
15 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.