FAS 529 (CH 17) over TWO MILE SLOUGH

1 MI E OF SADORUS · County 019, Illinois · Built 1988 · 2 Lanes · 800 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
8
Very Good

Bridge Details

Structure #
010026000000000
Year Built
1988
Length
19.1 m (62.7 ft)
Max Span
6.5 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
800
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.