FAP 326 (IL 47) over CAMP CREEK

1 MI N I-72 INT · County 019, Illinois · Built 1933 · 2 Lanes · 4,800 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
010022700000000
Year Built
1933
Length
7.9 m (25.9 ft)
Max Span
3.8 m
Lanes
2
Daily Traffic
4,800
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.