CH 12(FAS 516) over SALT FORK RIVER

1 MI N ST JOSEPH · County 019, Illinois · Built 1971 · 2 Lanes · 2,100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
010022000000000
Year Built
1971
Reconstructed
2005
Length
40.8 m (133.9 ft)
Max Span
13.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$257,000
Total Project Cost
$385,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.