FAP 709 (US 136) over OWL CREEK

E EDGE OF FISHER · County 019, Illinois · Built 1972 · 2 Lanes · 2,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
010021200000000
Year Built
1972
Length
36.6 m (120.1 ft)
Max Span
13.6 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
2,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$317,000
Total Project Cost
$475,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.