CH 50(FAS 1521) over I-74

E OF MAHOMET · County 019, Illinois · Built 1966 · 2 Lanes · 8,850 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
010015900000000
Year Built
1966
Reconstructed
2003
Length
76.6 m (251.3 ft)
Max Span
23.4 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
8,850
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$874,000
Total Project Cost
$1,311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.