FAU7177(LINC) over I-74
CHAMPAIGN · County 019, Illinois · Built 1956 · 6 Lanes · 9,650 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
40.135275, -88.219569
This bridge is in worse condition than 79.4% of bridges in County 019. The average bridge in Illinois is 0 years old; this one is 70 years old.
Nearby Bridges
I-74(WB) over W FORK SALINE BRANCH
Built 1956
I-74(EB) over W FORK SALINE BRANCH
Built 1956
FAU 7177 LINCOLN A over SALINE BR DRAIN DT
Built 2010
I-74 over CN Railwy & TR 158/Oak S
Built 1956
SOMER DR (MS 1400) over SALINE BRANCH
Built 1990
COUNTRY CLUB RD. over SALINE BR DRAIN DIT
Built 1979
FAU 7177/LINCOLN over SALINE BRANCH
Built 2004
TR 946 over SALINE BRANCH
Built 1900
I-74 over MARKET ST(FAU 7169)
Built 1957
TR 176 over SALINE BR DRAIN DIT
Built 1978
Bridge Details
- Structure #
- 010015800000000
- Year Built
- 1956
- Reconstructed
- 1990
- Length
- 57.9 m (190 ft)
- Max Span
- 15.7 m
- Width
- 25.8 m (84.6 ft)
- Lanes
- 6
- Daily Traffic
- 9,650
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $960,000
- Total Project Cost
- $1,440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.