TR 76 over Green Bay Hollow Crk

1 MI. S. of Meppen · County 013, Illinois · Built 2018 · 2 Lanes · 125 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

38.980139, -90.607542

This bridge is in worse condition than 19.8% of bridges in County 013. The average bridge in Illinois is 0 years old; this one is 8 years old.

Nearby Bridges

Bridge Details

Structure #
007308800000000
Year Built
2018
Length
17.2 m (56.4 ft)
Max Span
16.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
125
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A