ILLINOIS 100 over POOR FARM HOLLOW CRK

HARDIN HIGH SCH MP.9 · County 013, Illinois · Built 1996 · 2 Lanes · 3,400 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
007200500000000
Year Built
1996
Length
10.8 m (35.4 ft)
Max Span
3.4 m
Lanes
2
Daily Traffic
3,400
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.