TR 281 over EAST BUREAU CREEK

3 1/2 MI W OF DE PUE · County 011, Illinois · Built 2020 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
006431400000000
Year Built
2020
Length
43.3 m (142.1 ft)
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.