TR 36 over HICKORY SMITH DITCH

3 MI. NE. MINERAL · County 011, Illinois · Built 1995 · 2 Lanes · 25 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
006410800000000
Year Built
1995
Length
27.6 m (90.6 ft)
Max Span
11.5 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
25
Material
Wood or Timber
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.