TR 202 over W. BUREAU CREEK
6.5 MI SE OF WALNUT · County 011, Illinois · Built 1915 · 2 Lanes · 25 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
41.484928, -89.540439
This bridge is in worse condition than 84.2% of bridges in County 011. The average bridge in Illinois is 0 years old; this one is 111 years old.
Nearby Bridges
TR 109 over W BUREAU CREEK
Built 1984
TOWNSHIP RD 97A over W. BUREAU CR.
Built 1949
TR 109 over West Bureau Creek
Built 2013
TOWNSHIP RD 97A over W. BUREAU CR.
Built 1920
FAS 1220/CH 12-220 over BR. W. BUREAU CREEK
Built 1994
FAS-1220 (CH-12) over Br West Bureau Cr
Built 2017
TR 222 over W. BUREAU CREEK
Built 1910
TOWNSHIP ROAD 139 over W. BUREAU CREEK
Built 1983
TR 216 over LIME CREEK
Built 1986
TR 139 over BR. W. BUREAU CREEK
Built 1980
Bridge Details
- Structure #
- 006403500000000
- Year Built
- 1915
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.8 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Concrete
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $40,000
- Total Project Cost
- $60,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.