Backbone Rd FAS 24 over I-80
1.8 MI W JCT IL 26 · County 011, Illinois · Built 1963 · 2 Lanes · 1,050 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
41.3945, -89.502819
This bridge is in worse condition than 64.2% of bridges in County 011. The average bridge in Illinois is 0 years old; this one is 63 years old.
Nearby Bridges
I-80 WB over BUREAU CREEK
Built 1988
I-80 EB over BUREAU CREEK
Built 1988
FAS 244 over BUREAU CREEK
Built 2016
Epperson Road over EPPERSON RUN
Built 2020
TR 245 over BUREAU CREEK
Built 2007
IL 26 FAP 316 over I-80
Built 2003
US 6/34 FAS 1248 over BIG BUREAU CREEK
Built 1991
OLD DAD JOE TRAIL over BUREAU CREEK
Built 1863
TR 232 over UNNAMED STREAM
Built 1989
TR 188 over I-80
Built 1963
Bridge Details
- Structure #
- 006011600000000
- Year Built
- 1963
- Reconstructed
- 2006
- Length
- 85.8 m (281.5 ft)
- Max Span
- 26.3 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,050
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $222,000
- Total Project Cost
- $267,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.