I-80 WB over COAL CREEK

3.82 E/HENRY CO LN · County 011, Illinois · Built 1963 · 2 Lanes · 8,950 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
006000800000000
Year Built
1963
Reconstructed
2009
Length
42.8 m (140.4 ft)
Max Span
15.3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
8,950
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.