SPRING CENTER RD over I 90

3 MI W MCHENRY CO · County 007, Illinois · Built 2016 · 2 Lanes · 75 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
004996400000000
Year Built
2016
Length
79.9 m (262.1 ft)
Max Span
40.5 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
75
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.