I-90 over STREAM

0.7 MI W MCHENRY CO · County 007, Illinois · Built 1958 · 4 Lanes · 28,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
004995000000000
Year Built
1958
Length
8.4 m (27.6 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
28,000
Material
Concrete
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.