CH 6/FAS 777 over DRY BRANCH CREEK

1 M N WOBURN · County 005, Illinois · Built 1905 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
003303600000000
Year Built
1905
Reconstructed
1979
Length
31.4 m (103 ft)
Max Span
10.4 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.