ILL 127 over TRIB TO BEAVER CREEK

0.85 N CLINTON CO LI · County 005, Illinois · Built 1927 · 2 Lanes · 3,500 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
003200900000000
Year Built
1927
Length
12.2 m (40 ft)
Max Span
3.4 m
Lanes
2
Daily Traffic
3,500
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.