State Street SBI 1 over E Trib to Shoal Crk
0.1 MI W POCAHONTAS · County 005, Illinois · Built 1912 · 2 Lanes · 600 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
38.824317, -89.54895
This bridge is in worse condition than 78.4% of bridges in County 005. The average bridge in Illinois is 0 years old; this one is 114 years old.
Nearby Bridges
RUSSEL ST MSS 1034 over TRIB OF SHOAL CK
Built 1920
US 40 / POKEY ROAD over FAI 70 EB & WB
Built 1966
CH 20/FAS 781 over TRIB OF SHOAL CREEK
Built 2004
MSS 6130 over CONRAIL RR
Built 1901
FAS779 Pokey Rd CH over Trib. to Shoal Ck
Built 2013
US 40/FAS 779 over FAI 70 EB & WB
Built 1966
FAI 70 WB over W BR SHOAL CREEK
Built 1967
FAI 70 EB over W BR SHOAL CREEK
Built 1967
US 40/FAS 779 over W Fork Shoal Creek
Built 2017
US 40/FAS 779 over SHOAL CREEK
Built 1994
Bridge Details
- Structure #
- 003003800000000
- Year Built
- 1912
- Length
- 10.7 m (35.1 ft)
- Max Span
- 9.4 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Concrete
- Design
- Other
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $41,000
- Total Project Cost
- $45,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.