IL 140 over Shoal Creek

2.7mi E Old Ripley · County 005, Illinois · Built 1930 · 2 Lanes · 2,050 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
003002400000000
Year Built
1930
Reconstructed
2005
Length
110.9 m (363.8 ft)
Max Span
15.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,050
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,865,000
Total Project Cost
$2,052,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.