FAS 943 over SANDY CREEK W FORK

0.1 MI S OF DISWOOD · County 003, Illinois · Built 1983 · 2 Lanes · 1,100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
8
Very Good
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
002307100000000
Year Built
1983
Length
32.3 m (106 ft)
Max Span
10.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,100
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.