ILL 3 over PIGEON ROOST CREEK

OLIVE BRANCH · County 003, Illinois · Built 1965 · 2 Lanes · 3,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
002001100000000
Year Built
1965
Length
24.3 m (79.7 ft)
Max Span
8.7 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
3,300
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$287,000
Total Project Cost
$431,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.