TR 92 over BEAR CREEK

2.9 MI SE LIMA · County 001, Illinois · Built 1997 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 8 Very Good

Location

40.143303, -91.337258

This bridge is in worse condition than 16.1% of bridges in County 001. The average bridge in Illinois is 0 years old; this one is 29 years old.

Nearby Bridges

Bridge Details

Structure #
001340100000000
Year Built
1997
Length
74.4 m (244.1 ft)
Max Span
24.7 m
Width
7.3 m (24 ft)
Lanes
1
Daily Traffic
50
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.