CH 10 over BR. MC CRANEY CR.

4 MI. E PLAINVILLE · County 001, Illinois · Built 1989 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
001332100000000
Year Built
1989
Length
23.7 m (77.8 ft)
Max Span
23.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.