FAS 1599 over DRAINAGE CANAL

2.2 MI E MEYER · County 001, Illinois · Built 1980 · 2 Lanes · 150 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
001331000000000
Year Built
1980
Length
25 m (82 ft)
Max Span
24.1 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.