CH 11 over SOUTH FORKBEAR CREEK

3.96 MI N CAMP POINT · County 001, Illinois · Built 1975 · 2 Lanes · 900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
3
Serious
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 3 Serious
Superstructure 3 Serious
Substructure 7 Good

Location

40.097589, -91.068511

This bridge is in worse condition than 99.4% of bridges in County 001. The average bridge in Illinois is 0 years old; this one is 51 years old.

Nearby Bridges

Bridge Details

Structure #
001330300000000
Year Built
1975
Length
31.5 m (103.3 ft)
Max Span
11.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
900
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.