FAP 502/IL 57/3RD over PAYSON ST

.5M S US 24/MAINE ST · County 001, Illinois · Built 1959 · 4 Lanes · 7,300 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
001001200000000
Year Built
1959
Reconstructed
2021
Length
88.3 m (289.7 ft)
Max Span
37.8 m
Width
18.5 m (60.7 ft)
Lanes
4
Daily Traffic
7,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.