FDR 60099 over COPPER CREEK

COBALT WORK CENTER · County 059, Idaho · Built 1971 · 1 Lanes · 5 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
041301000001059
Year Built
1971
Reconstructed
1995
Length
10.4 m (34.1 ft)
Max Span
10.1 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
5
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.