FS ROUTE NO. 628 over E.F. BOULDER

EAST FORK BOULDER · County 021, Idaho · Built 2022 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

This bridge is in worse condition than 3.6% of bridges in County 021. The average bridge in Idaho is 0 years old; this one is 4 years old.

Bridge Details

Structure #
010400000036224
Year Built
2022
Length
19.8 m (65 ft)
Max Span
19.1 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Girder and Floorbeam System
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.