950 WEST ROAD over MAIN DRAIN

2.0 N 3.0 W. Burley · County 067, Idaho · Built 2024 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000037400
Year Built
2024
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Frame (except frame culverts)
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.