EAST SHORE RD over INDIAN CREEK
12.0 N. COOLIN · County 017, Idaho · Built 1970 · 2 Lanes · 110 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
48.625389, -116.826694
This bridge is in worse condition than 66.3% of bridges in County 017. The average bridge in Idaho is 0 years old; this one is 56 years old.
Nearby Bridges
STC5777;REEDER BAY over GRANITE CREEK
Built 1996
E SHORE ROAD over HUNT CREEK
Built 1975
EAST SHORE RD over TWO MOUTH CREEK
Built 1970
FS ROUTE 302 over GRANITE CREEK
Built 1952
FS ROUTE NO. 1347 over FEDAR CREEK
Built 2010
SH 57 over KALISPELL CREEK
Built 2020
FS ROUTE NO. 308 over KALISPELL CREEK
Built 1955
FS ROUTE NO. 638 over GRANITE CREEK
Built 2010
FS ROUTE NO. 2116A over BEAVER CREEK
Built 1986
FS ROUTE NO. 1341 over NO DATA ENTERED
Built 2007
Bridge Details
- Structure #
- 000000000037015
- Year Built
- 1970
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 110
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $277,000
- Total Project Cost
- $416,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.